VANCOUVER, BRITISH COLUMBIA — (MARKET WIRE) — 08/09/10 —
Of the 56 reported drill holes, 40 drill holes had intercepts of greater than 1.0% Cu with significant gold and silver values. Highlights include (see Table 1, Map 1 and Map 2 below):
— Hole AZC-089 which returned 25.5 metres of 1.08% Cu, 0.8 g/t Au and 16.6 g/t Ag; — Hole AZR-073 which returned 7.6 metres of 3.22% Cu, 3.0 g/t Au and 27.9 g/t Ag; — Hole AZR-077 which returned 13.7 metres of 1.27% Cu, 2.4 g/t Au and 19.4 g/t Ag; — Hole AZR-086 which returned 15.2 metres of 1.28 % Cu, 1.4 g/t Au and 17.4 g/t Ag; — Hole AZR-087 which returned 21.3 metres of 4.42% Cu, 2.9 g/t Au and 44.4 g/t Ag; — Hole AZR-088 which returned 24.4 metres of 1.19% Cu, 1.3 g/t Au and 14.2 g/t Ag; — Hole AZR-091 which returned 13.7 metres of 1.74% Cu, 1.0 g/t Au and 18.7 g/t Ag; — Hole AZR-093 which returned 18.3 metres of 1.80% Cu, 1.2 g/t Au and 21.2 g/t Ag; — Hole AZR-105 which returned 21.3 metres of 1.80% Cu, 1.5 g/t Au and 37.1 g/t Ag; — Hole AZR-115 which returned 15.2 metres of 1.96% Cu, 2.1 g/t Au and 34.8 g/t Ag; — Hole AZR-121 which returned 3.1 metres of 3.59% Cu, 5.5 g/t Au and 62.1 g/t Ag; — Hole AZR-126 which returned 16.8 metres of 1.40% Cu, 1.5 g/t Au and 17.8 g/t Ag; — Hole AZR-136 which returned 13.7 metres of 2.49% Cu, 2.8 g/t Au and 33.5 g/t Ag; and — Hole AZR-137 which returned 6.1 metres of 2.40% Cu, 3.7 g/t Au and 25.2 g/t Ag.
The drilling continues to intercept higher than average gold grades as drilling moves progressively along strike to the east of the Arroyos Azules zone, which is the first area scheduled for mining as part of the planned restart of operations (see News Releases No. 2010-09 and No. 2010-03 dated April 5, 2010 and February 15, 2010 respectively). This drilling was designed as follows:
— Infill drilling along the Arroyos Azules zone to continue underground mine planning; — Near surface definition drilling in the Glory Hole-Tiro Azules to Cabrestante zones, which is being evaluated as a potential; open-pit operation in conjunction with underground operations; and — Ongoing drilling along strike as part of a planned new resource estimate for the deposit.
Commenting on the above, Mr.
Patrick Downey, President and CEO of
Table 1 – Aranzazu Assays (see Map1 and Map 2 below)
—————————————————————————- Inter- Azi- val Cu muth Dip From To (1) (2) Au Ag (deg- (deg- (met- (met- (met- (4) (3) (3) Hole # East North rees) rees) res) res) res) (%) (g/t) (g/t) ————————————————————————— AZC-089 254473 2723863 30 -62 211.5 226.5 15.0 0.52 0.7 9.1 ————————————————————————— AZC-089 254473 2723863 30 -62 298.5 324.0 25.5 1.08 0.8 16.6 ————————————————————————— AZC-094 253999 2724394 210 -67 361.0 364.0 3.0 0.63 0.3 4.6 ————————————————————————— AZC-096 253947 2724252 211 -65 96.0 99.0 3.0 0.73 0.6 30.1 ————————————————————————— AZC-096 253947 2724252 211 -65 238.5 241.5 3.0 0.54 0.3 7.5 ————————————————————————— AZC-096 253947 2724252 211 -65 289.5 295.5 6.0 1.25 0.7 18.1 ————————————————————————— AZC-096 253947 2724252 211 -65 310.5 316.5 6.0 0.73 0.5 17.0 ————————————————————————— AZC-096 253947 2724252 211 -65 337.5 349.5 12.0 1.21 1.0 14.9 ————————————————————————— AZR-064 254149 2724143 212 -50 135.6 138.7 3.0 1.11 0.6 34.6 ————————————————————————— AZR-064 254149 2724143 212 -50 199.6 202.7 3.1 0.56 0.5 6.3 ————————————————————————— AZR-068 254468 2723861 201 -74 99.1 103.6 4.6 1.95 1.7 17.8 ————————————————————————— AZR-071 254498 2723862 212 -70 13.7 16.8 3.0 0.77 0.5 8.8 ————————————————————————— AZR-071 254498 2723862 212 -70 86.9 89.9 3.1 1.03 1.4 11.7 ————————————————————————— AZR-072 254498 2723860 215 -45 13.7 16.8 3.0 0.72 1.5 2.9 ————————————————————————— AZR-073 254518 2723846 210 -55 1.5 6.1 4.6 1.94 0.8 8.4 ————————————————————————— AZR-073 254518 2723846 210 -55 53.3 61.0 7.6 3.22 3.0 27.9 ————————————————————————— AZR-074 254509 2723830 219 -50 1.5 7.6 6.1 2.09 0.5 5.3 ————————————————————————— AZR-074 254509 2723830 219 -50 39.6 47.2 7.6 1.45 2.8 17.3 ————————————————————————— AZR-075 254070 2724119 210 -56 61.0 68.6 7.6 0.72 0.1 3.3 ————————————————————————— AZR-075 254070 2724119 210 -56 147.8 166.1 18.3 0.91 1.2 12.7 ————————————————————————— AZR-076 254094 2724108 211 -52 68.6 71.6 3.1 0.68 0.3 8.7 ————————————————————————— AZR-076 254094 2724108 211 -52 91.4 96.0 4.6 1.00 0.1 1.7 ————————————————————————— AZR-076 254094 2724108 211 -52 149.4 152.4 3.1 0.69 0.7 9.8 ————————————————————————— AZR-077 253957 2724059 177 -62 51.8 65.5 13.7 1.27 2.4 19.4 ————————————————————————— AZR-079 253922 2724026 178 -44 12.2 16.8 4.6 0.78 0.9 13.0 ————————————————————————— AZR-080 253922 2724027 181 -63 12.2 21.3 9.2 1.80 1.2 19.4 ————————————————————————— AZR-081 253901 2724037 182 -43 19.8 27.4 7.6 1.25 0.685 13.92 ————————————————————————— AZR-085 254434 2723893 210 -66 3.1 13.7 10.7 1.46 0.1 5.0 ————————————————————————— AZR-085 254434 2723893 210 -66 39.6 42.7 3.1 1.17 2.2 15.3 ————————————————————————— AZR-086 254525 2723806 209 -45 0.0 9.1 9.1 0.82 0.3 6.6 ————————————————————————— AZR-086 254525 2723806 209 -45 16.8 21.3 4.6 2.23 0.2 16.3 ————————————————————————— AZR-086 254525 2723806 209 -45 42.7 57.9 15.2 1.28 1.4 17.4 ————————————————————————— AZR-087 254469 2723857 204 -61 62.5 83.8 21.3 4.42 2.9 44.4 ————————————————————————— AZR-088 254549 2723795 215 -51 0.0 6.1 6.1 0.64 1.0 11.2 ————————————————————————— AZR-088 254549 2723795 215 -51 18.3 25.9 7.6 0.85 0.2 4.4 ————————————————————————— AZR-088 254549 2723795 215 -51 39.6 64.0 24.4 1.19 1.3 14.2 ————————————————————————— AZR-089 254473 2723867 29 -60 51.8 56.4 4.6 1.63 0.5 16.6 ————————————————————————— AZR-090 254425 2723876 213 -44 1.5 6.1 4.6 1.02 0.1 2.9 ————————————————————————— AZR-090 254425 2723876 213 -44 25.9 29.0 3.1 0.68 0.1 1.8 ————————————————————————— AZR-091 253942 2724040 185 -43 24.4 38.1 13.7 1.74 1.0 18.7 ————————————————————————— AZR-092 254555 2723807 212 -58 4.6 13.7 9.2 1.44 0.9 5.8 ————————————————————————— AZR-092 254555 2723807 212 -58 24.4 27.4 3.1 0.72 0.0 1.9 ————————————————————————— AZR-092 254555 2723807 212 -58 32.0 38.1 6.1 0.52 0.0 1.6 ————————————————————————— AZR-092 254555 2723807 212 -58 64.0 68.6 4.6 0.75 2.4 9.3 ————————————————————————— AZR-092 254555 2723807 212 -58 77.7 88.4 10.7 0.73 0.5 6.6 ————————————————————————— AZR-093 254498 2723862 214 -57 12.2 15.2 3.1 1.00 1.5 15.5 ————————————————————————— AZR-093 254498 2723862 214 -57 86.9 105.2 18.3 1.80 1.2 21.2 ————————————————————————— AZR-094 254562 2723769 212 -55 32.0 38.1 6.1 0.66 1.0 7.3 ————————————————————————— AZR-095 254568 2723781 209 -58 41.2 47.2 6.1 0.53 1.5 21.6 ————————————————————————— AZR-096 254378 2723861 27 -43 51.8 67.1 15.2 0.65 0.7 10.7 ————————————————————————— AZR-097 254582 2723757 213 -60 50.3 56.4 6.1 0.93 0.9 16.6 ————————————————————————— AZR-098 254544 2723838 210 -45 0.0 7.6 7.6 0.77 0.4 6.3 ————————————————————————— AZR-098 254544 2723838 210 -45 71.6 85.3 13.7 0.86 1.5 14.8 ————————————————————————— AZR-099 254544 2723838 210 -50 1.5 9.1 7.6 1.71 0.3 4.8 ————————————————————————— AZR-099 254544 2723838 210 -50 73.2 77.7 4.6 1.13 7.6 28.4 ————————————————————————— AZR-100 254583 2723758 204 -78 56.4 59.4 3.1 0.77 1.8 8.6 ————————————————————————— AZR-100 254583 2723758 204 -78 67.1 80.8 13.7 0.60 1.2 9.0 ————————————————————————— AZR-100 254583 2723758 204 -78 94.5 109.7 15.2 0.54 1.7 7.7 ————————————————————————— AZR-101 254605 2723744 210 -45 64.0 68.6 4.6 1.63 0.6 27.5 ————————————————————————— AZR-102 254605 2723744 210 -59 73.2 77.7 4.6 0.73 0.2 12.7 ————————————————————————— AZR-103 254605 2723744 210 -75 76.2 80.8 4.6 1.20 3.2 24.1 ————————————————————————— AZR-103 254605 2723744 210 -75 89.9 102.1 12.2 0.70 1.8 7.2 ————————————————————————— AZR-103 254605 2723744 210 -75 118.9 121.9 3.1 0.82 0.8 16.2 ————————————————————————— AZR-103 254605 2723744 210 -75 147.8 153.9 6.1 0.76 0.8 13.1 ————————————————————————— AZR-104 254434 2723893 210 -80 12.2 15.2 3.0 1.04 0.0 0.7 ————————————————————————— AZR-104 254434 2723893 210 -80 19.8 22.9 3.0 3.01 1.0 0.7 ————————————————————————— AZR-104 254434 2723893 210 -80 65.5 76.2 10.7 0.92 1.3 22.1 ————————————————————————— AZR-105 254604 2723742 31 -76 115.8 125.0 9.1 1.04 2.2 51.1 ————————————————————————— AZR-105 254604 2723742 31 -76 155.4 160.0 4.6 2.66 2.6 121.3 ————————————————————————— AZR-105 254604 2723742 31 -76 190.5 196.6 6.1 0.76 1.7 28.3 ————————————————————————— AZR-105 254604 2723742 31 -76 243.8 246.9 3.0 1.03 1.7 27.9 ————————————————————————— AZR-105 254604 2723742 31 -76 295.7 317.0 21.3 1.80 1.5 37.1 ————————————————————————— AZR-108 254358 2723805 24 -45 125.0 131.1 6.1 3.11 1.8 37.1 ————————————————————————— AZR-108 254358 2723805 24 -45 144.8 149.4 4.6 0.62 0.8 12.1 ————————————————————————— AZR-108 254358 2723805 24 -45 155.5 160.0 4.6 0.67 0.8 10.8 ————————————————————————— AZR-109 254605 2723744 210 -57 74.7 80.8 6.1 0.84 0.4 15.6 ————————————————————————— AZR-110 254605 2723744 210 -74 99.1 129.5 30.5 1.01 0.8 14.0 ————————————————————————— AZR-110 254605 2723744 210 -74 149.4 161.5 12.2 0.55 0.6 9.7 ————————————————————————— AZR-110 254605 2723744 210 -74 187.5 192.0 4.6 0.50 0.4 8.8 ————————————————————————— AZR-113 254622 2723724 30 -58 109.7 112.8 3.1 1.67 1.9 106.0 ————————————————————————— AZR-115 254544 2723838 210 -77 3.1 7.6 4.6 0.61 0.2 3.1 ————————————————————————— AZR-115 254544 2723838 210 -77 146.3 161.5 15.2 1.96 2.1 34.8 ————————————————————————— AZR-116 254592 2723772 210 -77 85.3 93.0 7.6 1.29 1.2 35.4 ————————————————————————— AZR-117 254570 2723792 210 -62 41.2 56.4 15.3 0.96 1.5 12.4 ————————————————————————— AZR-117 254570 2723792 210 -62 91.4 102.1 10.7 1.12 0.9 12.5 ————————————————————————— AZR-118 254528 2723865 210 -57 4.6 10.7 6.1 0.80 0.4 5.2 ————————————————————————— AZR-118 254528 2723865 210 -57 19.8 22.9 3.1 1.60 1.1 58.5 ————————————————————————— AZR-119 254570 2723792 210 -70 42.7 45.7 3.1 0.97 1.2 28.8 ————————————————————————— AZR-120 254570 2723792 210 -77 30.5 33.5 3.1 0.62 0.9 33.3 ————————————————————————— AZR-120 254570 2723792 210 -77 41.2 45.7 4.6 1.07 1.2 28.8 ————————————————————————— AZR-121 254528 2723865 210 -71 6.1 12.2 6.1 0.98 0.3 3.6 ————————————————————————— AZR-121 254528 2723865 210 -71 64.0 67.1 3.1 3.59 5.5 62.1 ————————————————————————— AZR-121 254528 2723865 210 -71 123.4 140.2 16.8 1.51 1.3 25.3 ————————————————————————— AZR-121 254528 2723865 210 -71 146.3 149.4 3.0 0.62 0.2 7.1 ————————————————————————— AZR-122 254551 2723809 210 -64 79.3 83.8 4.6 0.89 4.4 23.5 ————————————————————————— AZR-122 254551 2723809 210 -64 89.9 94.5 4.6 2.37 2.6 23.5 ————————————————————————— AZR-124 254528 2723865 210 -85 9.1 25.9 16.8 1.02 0.9 48.1 ————————————————————————— AZR-124 254528 2723865 210 -85 160.0 167.6 7.6 0.66 2.7 18.5 ————————————————————————— AZR-125 254199 2723989 210 -50 61.0 67.1 6.1 0.79 1.0 13.3 ————————————————————————— AZR-126 254632 2723740 210 -74 106.7 111.3 4.6 0.73 1.9 20.5 ————————————————————————— AZR-126 254632 2723740 210 -74 181.4 198.1 16.8 1.40 1.5 17.8 ————————————————————————— AZR-127 254378 2723900 210 -45 0.0 4.6 4.6 0.64 0.3 9.0 ————————————————————————— AZR-127 254378 2723900 210 -45 126.5 129.5 3.1 0.81 1.9 8.0 ————————————————————————— AZR-135 254212 2723969 210 -47 0.0 3.1 3.1 1.51 0.4 7.1 ————————————————————————— AZR-135 254212 2723969 210 -47 7.6 16.8 9.1 0.64 0.7 27.9 ————————————————————————— AZR-136 254470 2724857 210 -85 51.8 65.5 13.7 2.49 2.8 33.5 ————————————————————————— AZR-137 2723967 254244 207 -45 27.4 33.5 6.1 2.40 3.7 25.2 ————————————————————————— AZR-137 2723967 254244 207 -45 57.9 61.0 3.1 0.70 1.1 11.7 ————————————————————————— AZR-139 254472 2723862 25 -82 59.4 65.5 6.1 0.75 1.4 13.6 ————————————————————————— AZR-139 254472 2723862 25 -82 76.2 103.6 27.4 0.81 1.4 12.6 ————————————————————————— AZR-139 254472 2723862 25 -82 109.7 135.6 25.9 0.72 1.2 13.0 ————————————————————————— 1. true width has yet to be determined 2. using a copper cutoff grade 0.5% 3. fire assay and atomic absorption finish 4. atomic absorption (“AA”)
Qualified Person
Exploration at the
Alan Hitchborn, P.Geo., who is the Company’s Qualified Person as defined by NI 43-101. Mr. Hitchborn has also reviewed and approved the contents of this news release as applicable.
Quality Assurance and Quality Control (“QA/QC”) Procedures for the
About
Cautionary Statement:
This news release contains forward-looking statements that are not historical facts. Forward-looking statements involve risks, uncertainties and other factors that could cause actual results, performance, prospects and opportunities to differ materially from those expressed or implied by such forward-looking statements. Factors that could cause actual results to differ materially from these forward-looking statements include those risks set out in
To view Map 1 and Map 2, please click the following link: http://media3.marketwire.com/docs/auramaps8910.pdf
No stock exchange, securities commission or other regulatory authority has approved or disapproved the information contained herein.
Contacts:
Patrick Downey President & Chief Executive Officer (604) 669-4777 (604) 696-0212 (FAX) info@auraminerals.com www.auraminerals.com